Medical and dental clinics
Treatment rooms with welded seams and coving so disinfectant cannot reach the slab.
Commercial and strata facilities management, Melbourne
Office Mon to Fri, 9:00 am to 5:00 pm info@goldenstar.au

Think Floor, resilient floors
Commercial vinyl flooring covers sheet vinyl with welded seams, safety vinyl for wet areas and glue-down vinyl planks, laid over a prepared slab for clinics, shops, kitchens, schools and offices; laminate is the floating option for dry rooms. Both are supplied and installed through Think Floor, Golden Star's flooring division.
Vinyl hides nothing underneath it: a damp slab or a trowel ridge shows through within months. Moisture testing and floor levelling are part of every quote.
Products
Each product solves a different problem, and the wrong one in the wrong room is the most common reason a resilient floor fails early. Pick a type to see where it belongs and where it does not.
Heavy duty commercial vinyl flooring in sheet form is the standard for clinical rooms, aged care and school wet areas. Seams are grooved and heat-welded with a matching rod, and the vinyl is coved up the wall so there is no gap at the skirting for dirt to collect.
It handles bed wheels, trolleys and daily disinfectant well, as long as the slab under it is dry and flat.
Safety vinyl has grit set through its wear layer, so it keeps its grip when wet. It is the usual choice for commercial kitchen vinyl flooring, staff change rooms and ramps, chosen by its tested rating under AS 4586.
Close to fryers and cooklines, hot oil and dropped pans can still damage vinyl; those strips of floor are often better in commercial epoxy flooring or tile.
Planks and tiles give a timber or stone look with the toughness of vinyl. Commercial jobs use glue-down planks rather than click-together ones, because rolling loads and sun through shopfront glass can open click joints. The wear layer thickness on the specification sheet tells you how long it will last in traffic.
Laminate is a timber-look board that floats on an underlay with click joints. Commercial laminate flooring rated to a heavy-use abrasion class handles office traffic well and goes down quickly, but water in the joints swells the core, so it stays out of kitchens, washrooms and entries.




Scope
Most of the time on a vinyl job goes into the floor underneath. Installation practice for resilient sheet and tile is set out in AS 1884, and these are the stages we include.
Why floors fail
When commercial vinyl bubbles, lifts or opens at the seams, the cause is usually in the slab, not the vinyl. These are the problems we test for, what they look like later, and how they are dealt with before laying.
| Problem | What you see later | How it is handled |
|---|---|---|
| Moisture rising through the slab | Bubbles, lifting and adhesive turning soft | In-situ humidity testing; barrier primer if readings are high |
| Old covering left in place | Vinyl failing where the old floor once let moisture escape at its joints | Old floors removed and the slab retested |
| Trowel ridges and patches | Lines and bumps showing through the new floor | Ground flat and skimmed with smoothing compound |
| Cold or rushed install | Seams opening and edges shrinking back | Material acclimatised and the room kept at a steady temperature |
| Wrong adhesive for the room | Planks shifting under sun or rolling loads | Adhesive matched to the product and the traffic |
Moisture problems often take months to appear, which is why a floor that looked fine at handover can fail after the first wet winter.
How it runs
Vinyl jobs are planned around the time the room can be empty and the time the adhesive needs before the room is used again. One contract contact runs the job from first visit to handover.
Room measured, slab tested for moisture, and old coverings checked for asbestos if needed.
You get product options with their slip rating, wear layer and price for the area.
Rooms are booked out in stages; clinics and shops often use nights or weekends.
Old floor out, slab levelled and primed, then vinyl laid, rolled, welded and coved.
Light foot traffic once the adhesive allows, heavy rolling loads later, as the adhesive data sheet sets out.
Who it is for
Vinyl flooring in Melbourne commercial buildings mostly goes into rooms that are cleaned hard and used every day. These are the clients we plan for.
Treatment rooms with welded seams and coving so disinfectant cannot reach the slab.
Rooms where a smooth surface helps walkers, wheelchairs and toddlers alike.
Safety vinyl in prep rooms, change rooms and store rooms away from the cookline.
Vinyl planks that can be laid over a weekend between one fit-out and the next.
Classrooms, art rooms and wet areas, laid in the holidays when rooms are empty.
Kitchenettes and breakout areas in vinyl, with laminate or carpet tiles in the dry zones.
Price guide
Vinyl and laminate are priced per square metre installed, but preparation can change the total a lot. Two jobs with the same product can differ widely in price because one slab is dry and flat and the other is not.
| Item | From | What changes the price |
|---|---|---|
| Sheet vinyl, welded | On quote | Coving, number of seams and room shapes |
| Safety vinyl | On quote | Slip rating and wet area detailing |
| Vinyl planks, glue-down | On quote | Wear layer and pattern |
| Laminate | On quote | Abrasion class and underlay |
| Preparation | On quote | Old floor removal, levelling, moisture barrier |
Resilient floors are covered by installation, slip and food premises rules, and older buildings add an asbestos check. Certificates and policies sit on our accreditations and insurance page.
| Item | Detail |
|---|---|
| Installation practice | AS 1884 for resilient sheet and tile, together with the maker's instructions for adhesive and moisture limits |
| Slip resistance | Safety vinyl selected by its AS 4586 classification for the area in your specification |
| Food premises | Floors in food areas must be cleanable, impervious and free of places where water pools, which is why kitchens get welded seams and coving |
| Asbestos | Vinyl tiles and black adhesive in buildings from before 1990 are tested before lifting; removal is by a licensed asbestos removalist we book, not our floor crew |
Clinics, schools and retail tenancies across the inner east and south-east make up much of this work, along with CBD offices that can only close at night. See the full list of areas we cover.
Room sizes and a photo of the existing floor are a good start, emailed to info@goldenstar.au.
It is priced per square metre installed, plus preparation, which depends on the slab. We test the slab first so the quote includes any levelling or moisture barrier.
A well-laid commercial vinyl lasts many years; what changes is the surface care. Some vinyls have a factory coating that should not be stripped, while others need a strip and seal on a schedule set by traffic. We check the product before booking a strip and seal or setting a cleaning routine.
Installers are inducted to your site, including infection control rules in clinics and aged care.
Yes. Clinics, shops and schools often book nights, weekends or holidays. The adhesive still needs its set time before rolling loads, so we plan the hand-back around it.
We install across metropolitan Melbourne, with regional Victorian jobs considered when crews can travel.
Send the rooms, the current floor and when they can close. We will test the slab and quote the floor with its preparation included.