Apartment and strata buildings
Stairwells, corridors and car parks on common property. The owners corporation pays and the strata manager usually holds the logbook.
Commercial and strata facilities management, Melbourne
Office Mon to Fri, 9:00 am to 5:00 pm info@goldenstar.au

Essential safety measure
Emergency lighting testing proves that every emergency light and exit sign in a building stays lit on battery power for its rated time when the mains fails. Golden Star books the six-monthly test to AS/NZS 2293.2 through its commercial electrical team and records every fitting in a logbook.
That logbook is what the owner relies on for the annual essential safety measures report, so it is kept up to date after each visit and after each repair.
Each test is run by a licensed electrician from the contractor we engage
Scope
A six-monthly visit checks that each fitting can be seen, switches over to battery and lasts the full test, then records the result. These are the six parts of the visit.
Intervals
AS/NZS 2293.2 sets a six-monthly routine for testing emergency lighting, and the rest of the year is about catching failures between tests. This is how the cycle runs for a typical building.
Every six months
After a failed test
Between tests
Once a year
Emergency lighting is one of the essential safety measures Victorian owners must keep in working order. See essential safety measures for the full list and the annual report.
Who it is for
Most commercial and public buildings in Victoria have emergency lighting and exit signs installed under their building permit. These are the sites where we book exit light testing most often.
Stairwells, corridors and car parks on common property. The owners corporation pays and the strata manager usually holds the logbook.
Each floor plus fire stairs. Tests are timed so a floor is not left with flat batteries just before evening use.
Back-of-house corridors and loading docks, where stock stacked in front of exit signs is the most common defect.
High-bay fittings that need a lift to reach, so access is planned and priced before the visit.
Tested during holidays or after hours so classrooms are not disrupted by the isolation.
Occupied around the clock, so fittings are tested in small groups and never a whole wing at once.
On the day
A test visit takes a few hours for a small building and longer for a large one, because every fitting must run on battery for the full test time. The steps below are the same for every site.
We ask for the number of fittings and the floor plan or old logbook, then book a time that suits the building.
Tenants are told the lights will be on battery during the test. In aged care and medical sites the test runs in sections.
The electrician isolates the lighting circuits, times each fitting on battery and notes any that dim or go out early.
Mains supply is restored. Batteries need hours to recharge after a full discharge, which is why tests are not booked just before a busy night.
You receive the fault list with prices. Approved repairs are done and retested, and the logbook is updated.

Rules that apply
Emergency lighting is designed to AS/NZS 2293.1, tested to AS/NZS 2293.2, and maintained by the owner under the Building Regulations 2018. Insurance certificates for the electricians we engage are on our accreditations and safety page.
| Item | What applies | Golden Star detail |
|---|---|---|
| Routine testing | AS/NZS 2293.2, six-monthly | Booked and tracked in GS Connect |
| Design and duration | AS/NZS 2293.1 and the National Construction Code | Rated duration checked against the fitting label |
| Owner's duty | Building Regulations 2018 (Vic), essential safety measures | Logbook supplied for the annual report |
| Who tests | Licensed electrician | Available on request |
| Insurance | Public liability | Available on request |
Price guide
Testing is priced per fitting, and repairs are priced on top once we know what failed. The biggest saving is usually replacing only the failed battery or lamp instead of the whole fitting, so our fault list says which part failed.
| Item | From | What changes the price |
|---|---|---|
| Six-monthly test | On quote | Number of fittings and how spread out they are |
| Battery replacement | On quote | Battery type and whether the fitting has a drawer or must be opened |
| Fitting replacement | On quote | Old fittings with no spare parts, or a switch to LED |
| Minimum visit | On quote | Small buildings with only a few fittings |
We book emergency light testing for buildings across metropolitan Melbourne. Apartment towers in Southbank and Docklands are tested in sections, floor by floor, while single-level shops and warehouses in the south-east are often done in one visit. See the list of areas we service.
Ask us about your own building at info@goldenstar.au.
It is charged per fitting tested, with a minimum for small buildings, and any repairs are quoted separately. Send us the number of fittings, or an old logbook, and we will give you a fixed price.
Every six months under AS/NZS 2293.2, with a discharge test on battery each time. Failed fittings should be repaired and retested promptly rather than waiting for the next round, and the results recorded in the logbook.
Emergency lights are tested for the duration they were designed for, which is 90 minutes for most Australian buildings. A small block is not exempt because it is small; if the fittings are installed under the building permit, they must be maintained and tested.
Yes. The electricians hold Victorian licences, work for the registered contractor we use, and complete your site induction before the first test.
Yes, and for busy offices and shops it often is. Keep in mind that batteries need several hours to recharge after the test.
We test across metropolitan Melbourne. Regional Victorian buildings are taken on case by case, depending on how many fittings there are and our booking load.
Tell us how many emergency lights and exit signs the building has, or send the old logbook. We will price the test and set a date.