Commercial and strata facilities management, Melbourne

Office Mon to Fri, 9:00 am to 5:00 pm info@goldenstar.au

Worker in a protective suit cleaning a factory concrete floor, the preparation stage before commercial epoxy flooring in Melbourne

Think Floor, resin floors

Commercial epoxy flooring in Melbourne

Commercial epoxy flooring in Melbourne is a resin coating bonded to a prepared concrete slab, used in warehouses, workshops, food areas and plant rooms where the floor has to resist wear, chemicals and dust. Golden Star's Think Floor division tests the slab, grinds it, repairs it, then applies a coating system chosen for how the floor is used.

Most epoxy failures start underneath, with damp concrete or a weak surface. That is why every job here begins with moisture readings and a look at the slab, and why a quote may come back with a primer or repair line you did not expect.

Scope

What an epoxy floor coating job includes

An epoxy floor is only as good as the concrete it is stuck to, so more than half the work happens before any coating goes down. These are the stages we price on every job.

  • Moisture testingIn-situ relative humidity probes set into the slab, read against the limit on the coating maker's data sheet.
  • Mechanical preparationDiamond grinding or shot blasting to remove the weak top layer and give the primer something to grip. Acid etching is not used.
  • Old coating removalFailed or flaking coatings are taken back to sound concrete, because new resin will not hold an old coat down.
  • Crack and joint repairCracks filled, and saw-cut joints in forklift aisles filled with a semi-rigid filler so wheels do not chip the edges.
  • PrimerA penetrating primer, or a moisture-tolerant primer where the readings are high.
  • Body coatsRolled or trowelled coats built to the thickness the traffic calls for, from thin film to heavy-duty screed.
  • Anti-slip finishAggregate broadcast into wet, ramped or washdown areas to reach the specified slip rating.
  • Line marking and colour zonesWalkways and bays set out in the coating where the site plan asks for them.
  • Handover packProduct data sheets, cure times, care instructions and photos saved in GS Connect.

Choosing a system

Epoxy, polyurethane cement or polished concrete

Epoxy is not the answer for every slab. Industrial epoxy floor coating is strong in dry, heavy-traffic areas, but hot washdown kitchens and very large dry floors may be better served by something else.

Epoxy coating

Warehouses, workshops, dry food areas

  • Resists oils, many chemicals and abrasion
  • Colour, line marking and zones built in
  • Joint-free surface that is easy to sweep and scrub
  • Softens under hot washdowns and can crack with sharp temperature changes
  • Needs a dry, sound slab

Polyurethane cement

Cooklines, cool rooms, washdown areas

  • Copes with boiling water, steam and hot oil
  • More tolerant of moisture in the slab
  • Usually laid thicker, with coved edges
  • Fewer colour choices and a textured feel
  • Often the better pick behind a commercial cookline

Polished concrete

Large dry floors, retail, showrooms

  • No coating to peel or wear through
  • Upkeep is mostly scrubbing and burnishing
  • Less chemical resistance than a resin
  • Can be slippery when wet without treatment
  • See polished concrete and concrete grinding

How it runs

How an epoxy floor is laid without closing the site

Most commercial epoxy floor contractors work in stages so the business can keep trading. We split the floor into zones, coat one while the others stay in use, and plan the order with your operations manager.

  1. 1

    Survey and readings

    We measure the area, take moisture readings and mark cracks, joints, drains and the spots where forklifts turn.

  2. 2

    Zone plan

    The floor is divided into stages that can be closed one at a time, with racking, stock and walkways moved to suit.

  3. 3

    Prepare and repair

    Grinding with dust extraction, then crack and joint repairs, then a vacuum to leave a clean surface.

  4. 4

    Prime and coat

    Primer and coats applied within the time window on the data sheet, with temperature and humidity recorded.

  5. 5

    Cure and reopen

    The zone stays closed until it can take the traffic planned for it, then the next zone starts.

Warehouse aisle with racking and a forklift, the sort of floor coated in stages with epoxy

Downtime

Cure times for an epoxy floor coating

Cure time decides how long each zone stays closed. These are typical stages at a mild room temperature; a cold Melbourne slab in July can add a day or more, and the product data sheet always has the final say.

Same day

  • Coats applied and the zone taped off
  • No foot traffic on fresh resin

About 24 hours

  • Light foot traffic
  • Fittings and bins can go back carefully

About 2 to 3 days

  • Normal foot traffic and trolleys
  • Pallet jacks in many systems

About 7 days

  • Forklifts and vehicles
  • Full chemical resistance and wet cleaning

A floor that is washed or driven on too early can mark or lose its grip, so we would rather hold a zone closed a day longer. If your site cannot wait, ask about fast-cure systems, which shorten the wait but cost more per square metre.

Slip ratings, safety rules and insurance for epoxy floors

Resin floors bring three sets of rules: slip resistance, dust and chemical safety, and hygiene in food areas. Our insurance and policy documents are listed on the accreditations and safety page.

Slip ratings, safety rules and insurance for epoxy floors
ItemWhat applies
Slip resistanceNew surfaces are classified under AS 4586 by wet pendulum (P) and oil-wet ramp (R) tests; we build to the rating in your specification
Grinding dustConcrete dust contains crystalline silica, so grinding is done with on-tool extraction and an H-class vacuum under WorkSafe Victoria rules
Resin and solventsSafety data sheets on site, ventilation planned, and the area closed to others while coating
Food areasFloors must be easy to clean, not absorb grease or water, and drain without pooling

Price guide

Epoxy flooring prices in Melbourne

Epoxy flooring is priced per square metre, but the slab sets most of the cost. A sound, dry slab with no old coating is the cheapest case; a damp slab with flaking paint and broken joints can cost more to prepare than to coat.

Epoxy flooring prices in Melbourne
ItemFromWhat changes the price
Thin film coatingOn quoteLight traffic areas, two or three coats
Heavy-duty or self-levelling systemOn quoteThickness and forklift traffic
Commercial kitchen epoxy flooring with covingOn quoteDrains, falls and wall junctions
Preparation and old coating removalOn quoteWhat is on the slab now
Moisture-tolerant primerOn quoteOnly where readings are high

Epoxy floors across Melbourne

Most epoxy floor coating work in Melbourne is in the industrial west and south-east: Truganina, Laverton, Dandenong, Braeside and Mulgrave, where warehouses and factories are concentrated. City kitchens and plant rooms are covered too. See every area Golden Star covers.

Regions of Melbourne covered by Golden Star Port Phillip CBDInner southInner eastBaysideSouth-eastOuter south-eastWestNorth and eastSchematic, not to scale

Commercial epoxy flooring questions

A slab photo and the rough floor area are enough for a first reply from info@goldenstar.au.

How much does commercial epoxy flooring cost in Melbourne?

It is quoted per square metre after a site check, and preparation often costs as much as the coating. A clean, dry slab is the cheapest; old coatings and damp concrete add cost.

How often does an epoxy floor need recoating?

It depends on traffic. Forklift aisles and turning points wear first, and a fresh topcoat there can extend the life of the whole floor. We suggest a yearly look at worn lanes rather than waiting for bare concrete to show.

Are your epoxy floor crews police checked, insured and inducted?

Every crew is inducted to your site rules, forklift zones and emergency plan before work starts.

Can epoxy flooring be done after hours or over a weekend?

Yes. Many jobs are staged over weekends or shutdown periods. Cure time still applies, so a zone coated on Saturday may only take foot traffic on Monday and forklifts later in the week.

Which areas of Melbourne do you cover for epoxy floors?

We quote across metropolitan Melbourne. Industrial estates in the west, north and south-east make up most epoxy work, and regional Victorian sites can be quoted when a crew is free to travel.

Get your slab checked before you coat it

Send the floor area, what drives on it and when it can close. We will take moisture readings and send a staged plan with a price.

Book a slab checkCall 1300 38 38 62Office hours Monday to Friday, 9:00 am to 5:00 pm. Email info@goldenstar.au any time.